- Clear Lake: Replace exterior seal and half of the roof overhang
- Cummings: Replace majority of roof, floor coverings, exterior seal, portions of windows, upgrade the HVAC
- Gubser: Replace roof, majority of floor coverings, and HVAC roof top units and chillers
- Hazel Green: Replace half of the roof, plumbing supply lines, and fire alarm
- Keizer: Replace roof, fire alarm, intercom system, and portions of roof overhang
- Kennedy: Replace gym floor, half of the floor coverings, and repair half of parking lot
- McNary: Replace majority of roof, exterior seal, majority of windows, master clock, portions of ceiling tiles, stadium bleachers, upgrade fire alarm, repair and resurface parking lot, and repair and replace auditorium lighting panels
- Whiteaker: Replace roof, exterior seal, windows, floor coverings, portions of siding, half of the ceiling tiles, partition walls in 8 classrooms, hot water lines, water supply lines, resurface portions of parking lot, and upgrade the HVAC unit